An enjoyable swim for all

Last updated November 26, 2025
Reading time: 1 min

This project aims to install ramps and lifts at various Montréal pools. It is one of the winning projects of the third edition of Montréal’s participatory budget.

Description

Installing the equipment required for users living with functional limitations will provide improved access to the pool, so that they may cool down and enjoy the water safely.    

This project includes 6 boroughs, with a total budget of $4.2 M. 

Advancement

Discover the project details by borough:

Planning in progress 

  • Locations :
    • Pools located in Parc de la Confédération and in Parc Martin-Luther-King 
    • Pools located in the Centre sportif Côte-des-Neiges and in the Centre sportif Notre-Dame-de-Grâce 
    • Pool located in the Centre communautaire Notre-Dame-de-Grâce 
  • Budget: $1,075,000 
  • Starting date: September 2026 
  • Delivery date: Spring 2027

Preliminary analysis 

  • Location: To be determined 
  • Budget: $1,000,000 
  • Starting date: Fall 2026 
  • Delivery date: Fall 2027

Preliminary analysis 

  • Location:
    • Pierre-Lorange pool 
  • Budget: $1,500,000 
  • Starting date: To be determined 
  • Delivery date: To be determined

Preliminary analysis 

  • Locations: Outdoor pools (specific locations to be determined) 
  • Budget: $300,000 
  • Starting date: To be determined 
  • Delivery date: To be determined

Preliminary analysis 

  • Location:
    • Complexe aquatique Rosemont 
  • Budget: $66,000 
  • Starting date: To be determined 
  • Delivery date: To be determined

Preliminary analysis 

  • Preliminary analysis 
  • Location:
    • Pool located in Parc Painter 
  • Budget: $224,925 
  • Starting date: Fall 2027 or Fall 2028 
  • Delivery date: Summer 2028 or Summer 2029