Reconstruction on a water main: Avenue Atwater
Work to replace a water main under Avenue Atwater is underway in the boroughs of Ville-Marie and Sud-Ouest and in the city of Westmount.
Find out more about the worksite
When?
Summer 2026
Where?
The work will take place in 4 distinct phases on Avenue Atwater between:
- Avenue Lincoln and Boulevard De Maisonneuve Ouest
- Rue Sainte-Catherine Ouest and Boulevard René-Lévesque Ouest
- Rue Saint-Jacques and Rue Notre-Dame Ouest
- Boulevard René-Lévesque Ouest and Rue Saint-Antoine Ouest
What?
Inspection and monitoring of a main water line located under Atwater Avenue led to the conclusion that this line requires short-term repairs. These repairs will involve replacing 6-metre segments of the main water line:
- Reconstruction on a water main;
- Replacement of valves;
- Street paving.
Why?
This work is necessary to ensure a reliable, continuous, and safe drinking water distribution service to the population of the Island of Montreal.
Obstructions and Construction Info
Check the obstructions and construction info service to locate road closures caused by construction work related to this project.
Documentation
Quick search
Need help?
Contact us if you have questions.
Are you sure you want to leave this page?
This page is not available in English. You will be redirected to the English home page.
