Reconstruction of Boulevard LaSalle, from 2e Avenue to Rue Gordon
This worksite is located in Verdun borough.
Work on Boulevard LaSalle, between 2e Avenue and Rue Gordon, aims to rebuild the water and sewer lines, the pavement and sidewalks, as well as to modernize public utilities, streetlights and traffic lights.
- Let a thin stream of water flow to ensure continuous circulation in the pipes. The sink drain must not be obstructed
- Keep the cabinet doors open for hot air to circulate around the plumbing
- Ask a person to check your house in your absence
- Read the notice
All about this project
When
September 2025 to November 2026.
Winter break: From mid-December 2025 to January 19, 2026.
Where
Boulevard LaSalle, between 2e Avenue and Rue Gordon
What
- Replacement of secondary water pipes dating from 1917
- Replacement of sewer pipes dating from 1956
- Replacement of lead water service connections
- Reconstruction of the pavement across the full width
- Reconstruction of sidewalks
- Modernization of the public lighting system and traffic lights
- Construction of the access chamber and of the equipment of the Commission des Services Électriques de Montréal (CSEM) and Bell
- Deviation of an Énergir gas pipe
- Integration of infrastructures to drain stormwater and of curb extensions at intersections
- Plantation of trees, shrubs and perennials
- Installation of additional street furniture
Why
The project will allow for the reconstruction of aging drinking water and sewer lines, the removal of all lead water service connections, and the maintenance in good working order of the city’s water infrastructure, which is an essential service to the population.
The reconstruction of Boulevard LaSalle also aims to streamline mobility and enhance user safety through improved street lighting and the reconfiguration of sidewalks.
Advancement and impact of work
Go to Obstructions and worksites on the city’s website to locate the obstructions related to this project.
Documentation
Nearby Construction Site
Work on Hickson Street
The City of Montreal is also carrying out underground infrastructure replacement work between Verdun and Éthel streets. These works are essential to ensure the maintenance of municipal assets and the quality of service provided to residents.
Nature of the work:
- Replacement of sewer and water mains
- Replacement of lead water service lines
- Reconstruction of sidewalks, curbs, and roadway
- Construction of tree planting pits and curb extensions
Our teams are working to coordinate these two adjacent construction sites to minimize the impact on your daily life.
Quick search
Need help?
Contact us if you have questions.
Are you sure you want to leave this page?
This page is not available in English. You will be redirected to the English home page.
