Demolish an in-ground pool

Last updated October 29, 2024

Do you have an in-ground pool in your yard? Do you want to replace or to remove all its components? In some Montréal boroughs, a permit is required to demolish an in-ground pool. Learn how to apply for a permit.

If a permit is required to demolish an in-ground pool in your borough, please go to the point of service in the borough, with your documents, to submit an application for a permit.

My borough

Shows borough content for
Find a borough to filter the list of search content.

No borough selected.

A permit is required to demolish an in-ground pool.

Standards to comply with

  • All components of the pool must be removed before the hole is filled in
  • The type of fill must match the composition of the existing ground
  • Once the pool has been removed, vegetation must be planted on at least 20 per cent of the lot

Fee

You will be required to pay $9.80 for every $1,000 of work. Regardless of the amount of work, you must pay a minimum of $161.

Required documents

  • Certificate of location indicating where the pool is located
  • Landscape plan for the yard
  • Details about the fill to be used, together with a cross-sectional view of the ground

Communication channels

In person

Permit counter

555 Rue Chabanel Ouest
Suite 600
Montréal, QC H2N 2H8

Legislation

A permit is not required to demolish a swimming pool.

For guidelines on how to manage concrete and pool demolition debris, please contact the Ministère de l’Environnement, de la Lutte contre les changements climatiques, de la Faune et des Parcs.

A certificate of authorization is not required to demolish a swimming pool.

However, if the pool is located within the Mount Royal Heritage Site, additional standards may apply. Please contact the borough.

A permit is not required to demolish a swimming pool.

A permit is required to demolish an in-ground pool.

Fee

You will be required to pay $9.80 for every $1,000 of work. Regardless of the amount of work, you must pay a minimum of $161. Taxes are included.

Required documents

  • certificate of location showing the placement of the pool

Communication channels

In person

55 Avenue Dupras
Montréal, QC H8R 4A8

By appointment only.

Legislation

A permit is not required to demolish a swimming pool.

A permit is not required to demolish a swimming pool, except if the the property has historic value.

Permit fees

Processing fees for permit applications vary based on the projected cost of the work. You will be required to pay $9.80 for every $1,000 of work.

Regardless of the amount of work, you will be required to pay a minimum:

  • $161 for a strictly residential building
  • $473 for a commercial, industrial, institutional or mixed-use building

The projected costs must include all fees associated with the work (ex: plans, labour, equipment), taxes included.

Fees are non-refundable.

Further reading: The cost of a renovation permit

Required documents

The following documents are required to process your application:

  • Certificate of location
  • Yard layout plan showing the location of the pool and the equipment required to operate it
  • Contractor’s bid or cost estimate for the work, including taxes
  • technical sheet on the pool

If the building is a condominium:

  • Letter of authorization from each owner or resolution from the condominium syndicate

If you are a representative:

  • Power of attorney authorizing you to act on behalf of the owner

Learn more and make an appointment

A permit is required to demolish an in-ground pool.

Fee

The minimum fee is $116.60, including taxes.

Required documents

  • contractor’s bid
  • certificate of location
  • details on the means that will be used to remove the pool or the method used to dispose of debris

Communication channels

In person

Permit counter

15795, boulevard Gouin Ouest
(on the 2nd floor, rear door of the citizen reception and public safety office)
Montréal, QC H9H 1C5

A permit is not required to demolish a swimming pool.

A permit is required to demolish an in-ground pool.

Fee

You will be required to pay $10.50 for every $1,000 of work. Regardless of the amount of work, you must pay a minimum of $70.50.

Required documents

  • certificate of location
  • work plan and schedule
  • details on the method used to demolish the pool
  • contractor’s bid

Communication channels

In person

Permit counter

4241 Place de l'Hôtel-de-Ville
Montréal, QC H1H 1S4

A permit is required to demolish an in-ground pool.

If the pool is located within the Mount Royal Heritage Site, additional standards may apply. Please contact your borough.

Fee

You will be required to pay $9.80 for every $1,000 of work. Regardless of the amount of work, you must pay a minimum of $160.45.

Required documents

  • certificate of location
  • land reuse plan showing the percentage of surfaces with vegetation (before and after the work) on the entire property
  • details on the method used to remove all the pool components
  • contractor’s bid

If you are a representative:

  • power of attorney authorizing you to act on behalf of the owner

Communication channels

In person

Permit counter

1431 Avenue Van Horne, 2nd floor
Montréal, QC H2V 1K9

A permit is not required to demolish a swimming pool.

A permit is not required to demolish a swimming pool.

A permit is not required to demolish a swimming pool.

A permit is required to demolish an in-ground pool.

Fees

The permit for an in-ground pool costs $457.

Communication channels

In person

Permit counter

777, boulevard Marcel-Laurin
Saint-Laurent, QC H4M 2M7

Legislation

A permit is required to demolish a swimming pool.

You cannot backfill an in-ground pool. You must remove all the pool components:

  • concrete
  • frame
  • plumbing 
  • walls
  • etc.

Fee

The permit costs $475.

Required documents

  • certificate of location
  • bid for the work, including a description and the cost
  • new landscaping plan, if applicable

Communication channels

In person

8400 Boulevard Lacordaire
Montréal, QC H1R 3B1

A permit is not required to demolish a swimming pool.

If your property is located north of Rue Sherbrooke, a permit is required.

Required documents

  • certificate of location
  • details on the landscaping that will replace the pool and the backfill that will be used

Communication channels

In person

Permit counter

800 Boulevard De Maisonneuve Est
ground floor
Montréal, QC H2L 4L8

A permit is not required to demolish a swimming pool.