Install, replace or remove a fireplace or a fuel-burning stove
If you wish to install a natural gas fireplace or own a pollution-emitting solid fuel-burning stove and want to replace it with a certified appliance, you must obtain a permit to do so. Find out how to obtain a permit.
A renovation permit is required to install, replace or remove a solid fuel-burning appliance (wood, coal, eco-friendly logs, pellets).
In some boroughs, this permit is also required to install, replace or remove a stove or fireplace that uses another type of fuel (fuel oil, natural gas or propane).
You are first required to have your existing chimney inspected by a chimney sweep or a professional inspector in order to ensure that it is suitable for its intended use.
Once you have received your permit and completed your work, be sure to comply with all legislation by declaring the installation, replacement or removal of your appliance.
My borough
No borough selected.
A renovation permit is required to install, replace or remove:
- a solid fuel-burning appliance (wood, coal, eco-friendly logs, pellets)
- a stove or fireplace that uses another type of fuel (fuel oil, natural gas or propane)
Apply on line or at the permit counter. Be sure you have all documents with you.
Rules to follow
- Concerning a solid fuel-burning appliance, only the installation of an EPA- or CAN/CSA-B415.1-certified pellet-burning appliance is authorized.
- Appliances that use a different type of energy are authorized.
- Any mechanical equipment must not be visible on an exterior building facade.
Fire safety standards set out under the Québec Construction Code must be met when removing or installing an appliance.
Contact the permit counter to verify the rules applicable to your situation.
Fees
Processing fees for permit applications vary based on the projected cost of the work. You will be required to pay $9.80 for every $1,000 of work.
Regardless of the amount of work, you will be required to pay a minimum:
- $161 for a strictly residential building
- $473 for a commercial, industrial, institutional or mixed-use building.
The projected costs must include all fees associated with the work (ex. plans, labour, equipment), taxes included.
Additional fees may apply if your building or the area in which it is located has historic value or is subject to specific architectural standards.
The fees are non-refundable.
Required documents
- The appliance’s technical sheet
- Professional quality scale plan
- Cost estimate or contractor’s bid
If applicable:
- Certificate of location in the case of the construction or installation of an outdoor chimney
- Power of attorney from the owner
Communication channels
Payment method
- Credit card (MasterCard, Visa)
Point de service
Suite 600
Montréal, QC H2N 2H8
Legislation
A renovation permit is required to install, replace or remove:
- a solid fuel-burning appliance (wood, coal, eco-friendly logs, pellets)
- a stove or fireplace that uses another type of fuel (fuel oil, natural gas or propane)
Rules to follow
The use of solid fuels is prohibited unless the device or fireplace has been certified by the U.S. Environmental Protection Agency (EPA).
The atmospheric emission rate of the solid-fuel burning device must be less than or equal to 2.5 g/h of fine particles.
Fees
Processing fees for permit applications vary based on the projected cost of the work. You will be required to pay $9.80 for every $1,000 of work.
Regardless of the amount of work, you will be required to pay a minimum:
- $161 for a strictly residential building
- $473 for a commercial, industrial, institutional or mixed-use building.
The projected costs must include all fees associated with the work (ex. plans, labour, equipment), taxes included.
The fees are non-refundable.
Required documents
- The appliance’s technical sheet
- Professional quality scale plan
- Cost estimate or contractor’s bid
If applicable:
- Certificate of location in the case of the construction or installation of an outdoor chimney
- Power of attorney from the owner
- Photo of the wall where the fireplace is located or planned
- Proxy document signed by the property owner, letter of authorization from each co-owner or a resolution of the co-ownership board
Communication channels
In person
By appointment only.
Second floor
Montréal, QC H1J 2E9
Any questions?
For more information or to take an appointment, please contact us :
- by phone : 514 493-5115
- by email : [email protected]
Legislation
A renovation permit is required to install, replace or remove:
- a solid fuel-burning appliance (wood, coal, eco-friendly logs, pellets)
- a stove or fireplace that uses another type of fuel (fuel oil, natural gas or propane)
Apply on line or at the permit counter. Be sure you have all documents with you.
Fees
Processing fees for permit applications vary based on the projected cost of the work. You will be required to pay $9.80 for every $1,000 of work.
Regardless of the amount of work, you will be required to pay a minimum:
- $161 for a strictly residential building
- $473 for a commercial, industrial, institutional or mixed-use building.
The projected costs must include all fees associated with the work (ex. plans, labour, equipment), taxes included.
Additional fees may apply if your building or the area in which it is located has historic value or is subject to specific architectural standards.
The fees are non-refundable.
Required documents
- The appliance’s technical sheet
- Professional quality scale plan
- Cost estimate or contractor’s bid
If applicable:
- Certificate of location in the case of the construction or installation of an outdoor chimney
- Power of attorney from the owner
Communication channels
Payment method
- Credit card (MasterCard, Visa)
Point de service
Montréal, QC H3X 2H9
Legislation
A renovation permit is required to install, replace or remove:
- a solid fuel-burning appliance (wood, coal, eco-friendly logs, pellets)
- a stove or fireplace that uses another type of fuel (fuel oil, natural gas or propane)
Apply at the permit counter. Be sure you have all documents with you.
Fees
Processing fees for permit applications vary based on the projected cost of the work. You will be required to pay $9.80 for every $1,000 of work.
Regardless of the amount of work, you will be required to pay a minimum:
- $161 for a strictly residential building
The projected costs must include all fees associated with the work (ex. plans, labour, equipment), taxes included.
Additional fees may apply if your building or the area in which it is located has historic value or is subject to specific architectural standards.
The fees are non-refundable.
Required documents
- The appliance’s technical sheet
- Professional quality scale plan
- Cost estimate or contractor’s bid
If applicable:
- Certificate of location in the case of the construction or installation of an outdoor chimney
- Power of attorney from the owner
Communication channels
Point de service
Montréal, QC H8S 2N4
Legislation
Apply on line or at the permit counter. Be sure you have all documents with you.
Fees
Processing fees for permit applications vary based on the projected cost of the work. You will be required to pay $9.80 for every $1,000 of work.
Regardless of the amount of work, you will be required to pay a minimum:
- $161 for a strictly residential building
- $473 for a commercial, industrial, institutional or mixed-use building.
The projected costs must include all fees associated with the work (ex. plans, labour, equipment), taxes included.
Additional fees may apply if your building or the area in which it is located has historic value or is subject to specific architectural standards.
The fees are non-refundable.
Required documents
- The appliance’s technical sheet
- Professional quality scale plan
- Cost estimate or contractor’s bid
If applicable:
- Certificate of location in the case of the construction or installation of an outdoor chimney
- Power of attorney from the owner
Apply
Payment method
- Credit card (MasterCard, Visa)
Montréal, QC H8R 4A8
Payment method
Click on the place to see accepted methods of payment.
By appointment only.
Legislation
A renovation permit is required to install, replace or remove:
- a solid fuel-burning appliance (wood, coal, eco-friendly logs, pellets)
- a stove or fireplace that uses another type of fuel (fuel oil, natural gas or propane)
Apply online or at the permit counter. Be sure you have all documents with you.
Fees
Processing fees for permit applications vary based on the projected cost of the work. You will be required to pay $9.80 for every $1,000 of work.
Regardless of the amount of work, you will be required to pay a minimum:
- $161 for a strictly residential building
- $473 for a commercial, industrial, institutional or mixed-use building.
An additional fee of $3.50 applies for every $1,000 of work for the review of restoration, replacement or transformation work carried out on a part of a building visible from a public street.
The projected costs must include all fees associated with the work (ex. plans, labour, equipment), taxes included.
Additional fees may apply if your building or the area in which it is located has historic value or is subject to specific architectural standards.
The fees are non-refundable.
Required documents
- The appliance’s technical sheet
- Professional quality scale plan
- Cost estimate or contractor’s bid
If applicable:
- Certificate of location in the case of the construction or installation of an outdoor chimney
- Power of attorney from the owner
Communication channels
The person responsible for processing your application will contact you within a maximum of 14 days of submission. The time required to issue a permit depends on the nature of the application, its complexity and the season.
Payment method
- Credit card (MasterCard, Visa)
Point de service
Fifth floor
Montréal, QC H2T 3E6
Legislation
A renovation permit is required to install, replace or remove:
- a solid fuel-burning appliance (wood, coal, eco-friendly logs, pellets)
- a stove or fireplace that uses another type of fuel (fuel oil, natural gas or propane)
Apply online, at the permit counter or by phone at 311.
Fees
Processing fees for permit applications vary based on the projected cost of the work. You will be required to pay $9.80 for every $1,000 of work.
Regardless of the amount of work, you will be required to pay a minimum:
- $161 for a strictly residential building
- $473 for a commercial, industrial, institutional or mixed-use building.
The projected costs must include all fees associated with the work (ex. plans, labour, equipment), taxes included.
Additional fees may apply if your building or the area in which it is located has historic value or is subject to specific architectural standards.
The fees are non-refundable.
For general information, please contact the permit counter.
Required documents
- The appliance’s technical sheet
- Professional quality scale plan
- Cost estimate or contractor’s bid
If applicable:
- Certificate of location in the case of the construction or installation of an outdoor chimney
- Power of attorney from the owner
Communication channels
Submit your renovation permit applications all at once (building interior, roof, doors and windows, exterior siding, projections such as stairs, balconies and terraces).
You need an account on montreal.ca to use this service.
Payment method
- Credit card (MasterCard, Visa)
Outside of Montréal: 514-872-0311
Monday to Friday: From 8:30 a.m. to 8:30 p.m.
Saturday, Sunday and public holidays: From 9 a.m. to 5 p.m.
Legislation
A renovation permit is required to install, replace or remove:
- a solid fuel-burning appliance (wood, coal, eco-friendly logs, pellets)
- a stove or fireplace that uses another type of fuel (fuel oil, natural gas or propane)
Apply online or at the permit counter. Be sure you have all documents with you.
Fees
Processing fees for permit applications vary based on the projected cost of the work. You will be required to pay $9.80 for every $1,000 of work.
Regardless of the amount of work, you will be required to pay a minimum:
- $161 for a strictly residential building
- $473 for a commercial, industrial, institutional or mixed-use building.
The projected costs must include all fees associated with the work (ex. plans, labour, equipment), taxes included.
Additional fees may apply if your building or the area in which it is located has historic value or is subject to specific architectural standards.
The fees are non-refundable.
Required documents
- The appliance’s technical sheet
- Professional quality scale plan
- Cost estimate or contractor’s bid
If applicable:
- Certificate of location in the case of the construction or installation of an outdoor chimney
- Power of attorney from the owner
Communication channels
Payment method
- Credit card (MasterCard, Visa)
Point de service
(on the 2nd floor, rear door of the citizen reception and public safety office)
Montréal, QC H9H 1C5
Legislation
Apply online or at the permit counter. Be sure you have all documents with you.
Fees
Processing fees for permit applications vary based on the projected cost of the work. You will be required to pay $9.80 for every $1,000 of work.
Regardless of the amount of work, you will be required to pay a minimum:
- $161 for a strictly residential building
- $473 for a commercial, industrial, institutional or mixed-use building.
The projected costs must include all fees associated with the work (ex. plans, labour, equipment), taxes included.
Additional fees may apply if your building or the area in which it is located has historic value or is subject to specific architectural standards.
The fees are non-refundable.
Required documents
- The appliance’s technical sheet
- Professional quality scale plan
- Cost estimate or contractor’s bid
If applicable:
- Certificate of location in the case of the construction or installation of an outdoor chimney
- Power of attorney from the owner
Communication channels
Payment method
- Credit card (MasterCard, Visa)
Point de service
Montréal, QC H1N 1E1
Legislation
A renovation permit is required to install, replace or remove:
- a solid fuel-burning appliance (wood, coal, eco-friendly logs, pellets)
- a stove or fireplace that uses another type of fuel (fuel oil, natural gas or propane)
Apply online or at the permit counter. Be sure you have all documents with you.
Fees
Processing fees for permit applications vary based on the projected cost of the work. You will be required to pay $9.80 for every $1,000 of work.
Regardless of the amount of work, you will be required to pay a minimum:
- $161 for a strictly residential building
- $473 for a commercial, industrial, institutional or mixed-use building.
The projected costs must include all fees associated with the work (ex. plans, labour, equipment), taxes included.
Additional fees may apply if your building or the area in which it is located has historic value or is subject to specific architectural standards.
The fees are non-refundable.
Required documents
- The appliance’s technical sheet
- Professional quality scale plan
- Cost estimate or contractor’s bid
If applicable:
- Certificate of location in the case of the construction or installation of an outdoor chimney
- Power of attorney from the owner
Communication channels
Payment method
- Credit card (MasterCard, Visa)
Point de service
Montréal, QC H1H 1S4
Legislation
Apply online or at the permit counter. Be sure you have all documents with you.
Fees
Processing fees for permit applications vary based on the projected cost of the work. You will be required to pay $9.80 for every $1,000 of work.
Regardless of the amount of work, you will be required to pay a minimum:
- $160.45 for a strictly residential building
- $472.16 for a commercial, industrial, institutional or mixed-use building.
The projected costs must include all fees associated with the work (ex. plans, labour, equipment), taxes included.
Additional fees may apply if your building or the area in which it is located has historic value or is subject to specific architectural standards.
The fees are non-refundable.
Permit validity
The permit is valid for a period of 18 months. Work must begin within 12 months of obtaining the permit and may not be interrupted for six consecutive months or more.
Required documents
- the title to property establishing that the applicant is the owner of the building, along with the certificate of location
- the plans, elevations, sections, details and construction specifications required to clearly understand the construction project, its use and the use of the lot; these plans must be provided on a scale of at least 1:100
- the various permits, certificates and authorizations required by the authorities
If applicable :
- a site development and architectural integration plan that respects heritage and includes the documents required under by-law 1189 concerning such plans (PIIA)
Communication channels
Payment method
- Credit card (MasterCard, Visa)
Point de service
Montréal, QC H2V 1K9
Legislation
A renovation permit is required to install, replace or remove:
- a solid fuel-burning appliance (wood, coal, eco-friendly logs, pellets)
- a stove or fireplace that uses another type of fuel (fuel oil, natural gas or propane)
Apply online or at the permit counter. Be sure you have all documents with you.
Fees
Processing fees for permit applications are $60.
Additional fees may apply if your building or the area in which it is located has historic value or is subject to specific architectural standards.
The fees are non-refundable.
Communication channels
Payment method
- Credit card (MasterCard, Visa)
Point de service
Montréal, QC H9A 2Z4
Legislation
A renovation permit is required to install, replace or remove:
- a solid fuel-burning appliance (wood, coal, eco-friendly logs, pellets)
- a stove or fireplace that uses another type of fuel (fuel oil, natural gas or propane)
Apply online or at the permit counter. Be sure you have all documents with you.
Fees
Processing fees for permit applications vary based on the projected cost of the work. You will be required to pay $9.80 for every $1,000 of work.
Regardless of the amount of work, you will be required to pay a minimum:
- $161 for a strictly residential building
The projected costs must include all fees associated with the work (ex. plans, labour, equipment), taxes included.
Additional fees may apply if your building or the area in which it is located has historic value or is subject to specific architectural standards.
The fees are non-refundable.
Required documents
- The appliance’s technical sheet
- Professional quality scale plan
- Cost estimate or contractor’s bid
If applicable:
- Certificate of location in the case of the construction or installation of an outdoor chimney
- Power of attorney from the owner
Communication channels
Payment method
- Credit card (MasterCard, Visa)
Point de service
Montréal, QC H1B 2Z1
Legislation
Apply online or at the permit counter. Be sure you have all documents with you.
Fees
Processing fees for permit applications vary based on the projected cost of the work. You will be required to pay $9.80 for every $1,000 of work.
Regardless of the amount of work, you will be required to pay a minimum:
- $161 for a strictly residential building
- $473 for a commercial, industrial, institutional or mixed-use building.
The projected costs must include all fees associated with the work (ex. plans, labour, equipment), taxes included.
Additional fees may apply if your building or the area in which it is located has historic value or is subject to specific architectural standards.
The fees are non-refundable.
Required documents
- Appliance data sheet
- Certificate of location in the case of the construction or installation of an outdoor chimney
- Details of chimney partition walls
- Roof clearance
Communication channels
Payment method
- Credit card (MasterCard, Visa)
Point de service
Second floor
Montréal, QC H2G 2B3
Legislation
Apply online or at the permit counter. Be sure you have all documents with you.
Fees
Processing fees for permit applications vary based on the projected cost of the work. You will be required to pay $9.80 for every $1,000 of work.
Regardless of the amount of work, you will be required to pay a minimum:
- $161 for a strictly residential building
The projected costs must include all fees associated with the work (ex. plans, labour, equipment), taxes included.
Additional fees may apply if your building or the area in which it is located has historic value or is subject to specific architectural standards.
The fees are non-refundable.
Issuance period
The issuance period for a renovation permit varies between 30 and 60 days from the date of receipt of the application.
Permit validity
The certificate is valid for a period of six months. The work must start within three months of obtaining it.
Required documents
Two copies of scale plans, including:
- floor plans showing the placement of the fireplace and chimney
- elevation drawings and vertical cross-section of the fireplace
- certificate of location showing the placement of all outdoor chimney sections on the wall or rooftop
- vertical cross-sections and details of construction
- data sheets attesting that the fireplace and chimney are certified
Communication channels
Payment method
- Credit card (MasterCard, Visa)
Point de service
Saint-Laurent, QC H4M 2M7
Legislation
Apply at the permit counter or online. Be sure you have all documents with you.
Fees
Processing fees for permit applications vary based on the projected cost of the work. You will be required to pay $9.80 for every $1,000 of work.
Regardless of the amount of work, you will be required to pay a minimum:
- $161 for a strictly residential building
The projected costs must include all fees associated with the work (ex. plans, labour, equipment), taxes included.
Additional fees may apply if your building or the area in which it is located has historic value or is subject to specific architectural standards.
The fees are non-refundable.
Required documents
- The appliance’s technical sheet
- Professional quality scale plan
- Cost estimate or contractor’s bid
If applicable:
- Certificate of location in the case of the construction or installation of an outdoor chimney
- Power of attorney from the owner
Communication channels
Point de service
Montréal, QC H1R 3B1
Legislation
A renovation permit is required to install, replace or remove:
- a solid fuel-burning appliance (wood, coal, eco-friendly logs, pellets)
- a stove or fireplace that uses another type of fuel (fuel oil, natural gas or propane)
Apply online or at the permit counter. Be sure you have all documents with you.
Fees
Processing fees for permit applications vary based on the projected cost of the work. You will be required to pay $9.80 for every $1,000 of work.
Regardless of the amount of work, you will be required to pay a minimum:
- $161 for a strictly residential building
- $473 for a commercial, industrial, institutional or mixed-use building.
The projected costs must include all fees associated with the work (ex. plans, labour, equipment), taxes included.
Additional fees may apply if your building or the area in which it is located has historic value or is subject to specific architectural standards.
The fees are non-refundable.
Required documents
- The appliance’s technical sheet
- Professional quality scale plan
- Cost estimate or contractor’s bid
If applicable:
- Certificate of location in the case of the construction or installation of an outdoor chimney
- Power of attorney from the owner
Communication channels
Payment method
- Credit card (MasterCard, Visa)
Point of service
Suite 109
Montréal, QC H4G 1M4
Payment method
Click on the place to see accepted methods of payment.
Legislation
Apply online or at the permit counter. Be sure you have all documents with you.
Fees
Processing fees for permit applications vary based on the projected cost of the work. You will be required to pay $9.80 for every $1,000 of work.
Regardless of the amount of work, you will be required to pay a minimum:
- $161 for a strictly residential building
- $473 for a commercial, industrial, institutional or mixed-use building.
The projected costs must include all fees associated with the work (ex. plans, labour, equipment), taxes included.
Additional fees may apply if your building or the area in which it is located has historic value or is subject to specific architectural standards.
The fees are non-refundable.
Permit validity
The permit is valid for a period of 18 months. The work must start within 12 months of obtaining the permit and may not be interrupted for a period of six consecutive months or more.
Required documents
- The appliance’s technical sheet
- Professional quality scale plan
- Cost estimate or contractor’s bid
If applicable:
- Certificate of location in the case of the construction or installation of an outdoor chimney
- Power of attorney from the owner
Communication channels
Payment method
- Credit card (MasterCard, Visa)
Point de service
ground floor
Montréal, QC H2L 4L8
Legislation
A renovation permit is required to install, replace or remove:
- a solid fuel-burning appliance (wood, coal, eco-friendly logs, pellets)
- a stove or fireplace that uses another type of fuel (fuel oil, natural gas or propane)
Apply online or at the permit counter. Be sure you have all documents with you.
Fees
Processing fees for permit applications vary based on the projected cost of the work. You will be required to pay $9.80 for every $1,000 of work.
Regardless of the amount of work, you will be required to pay a minimum:
- $161 for a strictly residential building
- $473 for a commercial, industrial, institutional or mixed-use building.
The projected costs must include all fees associated with the work (ex. plans, labour, equipment), taxes included.
Additional fees may apply if your building or the area in which it is located has historic value or is subject to specific architectural standards.
The fees are non-refundable.
Required documents
- The appliance’s technical sheet
- Professional quality scale plan
- Cost estimate or contractor’s bid
If applicable:
- Certificate of location in the case of the construction or installation of an outdoor chimney
- Power of attorney from the owner
Communication channels
Payment method
- Credit card (MasterCard, Visa)
Point de service
Suite 111
Montréal, QC H3N 1M3
Legislation
Find a borough
Boroughs
Need help?
Contact us if you have questions.
Are you sure you want to leave this page?
This page is not available in English. You will be redirected to the English home page.