Obstruction to traffic – Boulevard de Pierrefonds at the intersection of Rue Harry-Worth
From 06/27/2025
• Estimated duration: 3 weeks
• The obstruction will be located on the north side of Boulevard de Pierrefonds. One lane of traffic per direction will be maintained at all times;
• Rue Harry-Worth, north side: no access to Boulevard de Pierrefonds. Detour route planned;
• Bike lane closed. On-site signage will indicate the detour to follow;
• Access to buildings and businesses will be maintained.
Active work site
• Boulevard de Pierrefonds, at the intersection of Boulevard Jacques-Bizard.
• Word schedule
• Monday to Friday, 7:00 a.m. to 7:00 p.m.;
• Saturday and Sunday, 9:00 a.m. to 7:00 p.m., as needed.
• Reason: New water main construction
• Information: https://montreal.ca/en/articles/boulevard-de-pierrefonds-and-boulevard-jacques-bizard-new-water-mains-63246
Need help?
Contact us if you have questions.
Are you sure you want to leave this page?
This page is not available in English. You will be redirected to the English home page.