Avenue des Pins project: news and impacts
Work projects on Avenue des Pins could have an impact on your daily life. Find out what you need to know.
Work on underground infrastructure and the redesign of the street will continue from Boulevard Saint-Laurent to Avenue du Parc until the end of September 2023.
Project news
Find the latest news about the project and what Montréal is doing to reduce its impacts here.
Current and future work
From spring 2022 to the end of summer 2023 between Boulevard Saint-Laurent and Avenue du Parc:
- Replacement of water pipes
- Reconstruction and repair of sewer lines
- Replacement of lead water-service entries on public and private sections
- Work on the electric, gas and cable networks
- Creation of a public plaza at Rue Jeanne-Mance, including installation of an artwork commemorating nurses
- Relocation of lampposts and traffic lights to enlarge space on the sidewalks
- Installation of raised pedestrian crosswalks
- Construction of vegetated curb extensions
- Addition of one-way, protected bike paths
- Upgrading of traffic signals and street lighting
- Planting of about 60 trees, in addition to the hundred already planted during Phase One of the work
Starting in summer 2023, between Rue Saint-Denis and Avenue du Parc:
- Installation of bicycle racks and contemporary street furniture
- Creation of a historic walking tour presenting the district’s rich history
Work schedule
- Monday to Friday from 7 a.m. to 6 p.m.
- Evenings and weekends if necessary
Planned detours
Please consult the map to visualize the obstacles and the development of traffic in the sector under construction.
Hindrances during work on Avenue des Pins
On Avenue des Pins, between Boulevard Saint-Laurent and Avenue du Parc:
- Complete closure between April to September 2023
- Barriers projected at various intersections in the work zone
- Partial closure of the intersection at Avenue des Pins and Boulevard Saint-Laurent until the end of September 2023.
Access to buildings
Pedestrian access to residences, businesses and buildings will be maintained at all times.
Work managers will closely collaborate with businesses and institutions to reduce temporary obstructions to their buildings and impacts on their activities.
Anticipated impacts
- Water will be shut off for a few short periods of time (between two and 12 hours) during infrastructure work
- The use of construction tools and other equipment needed to complete the work may cause dust, noise and vibrations, despite all the limitation efforts put in place
Information session about redevelopment work on Avenue des Pins
Watch the latest information session on the upcoming work on Avenue des Pins, between Boulevard St. Laurent and Avenue du Park, which took place on April 7, 2022.
To watch the first virtual information session on the Avenue des Pins project (April 7, 2021), click here (In french).
Newsletter
View the newsletter.
Work in progress notices
View the most recent notices to residents.
- Projet des Pins - Réaménagement terminé - 30 octobre 2023 (in French) [PDF 4 MB]
- Projet des Pins - Avis d'avancement des travaux et réouverture - 29 septembre 2023 (in French) [PDF 225 KB]
- Projet des Pins - Avis de fermeture complète des intersection Saint-Laurent / des Pins et Saint-Urbain / des Pins - 8 septembre 2023 (in French) [PDF 371 KB]
- Projet des Pins - Avis de sablage des trottoirs, entre du Parc et Saint-Urbain - 14 août (in French) [PDF 440 KB]
- Projet des Pins - Reconstruction de trottoirs à l'intersection Saint-Laurent et des Pins - 3 juillet (in French) [PDF 360 KB]
- Projet des Pins - Avis Déménagements (in French) [PDF 723 KB]
- Projet de l'avenue des Pins - Fermeture de l’intersection Saint-Urbain et des Pins (in French) [PDF 697 KB]
- Projet des Pins - Réouverture de l’intersection Saint-Laurent et des Pins - Dès le 3 avril (in French) [PDF 586 KB]
- Projet de l'avenue des Pins_avis de travaux_installation de pompes temporaires_rue Clark et le boulevard Saint-Laurent_mars 2023 (in French) [PDF 385 KB]
- Projet des Pins - À l’intersection de l’avenue des Pins et du boulevard Saint-Laurent - 19 et 22 février 2023 (in French) [PDF 381 KB]
- Projet des Pins - Complete closure at the intersection of Saint-Laurent and des Pins- from February 27, 2023 [PDF 386 KB]
- Projet de l'avenue des Pins - Fermeture de la rue Clark entre des Pins et Guilbault - Dès le 6 février 2023 (in French) [PDF 381 KB]
- Projet des Pins - Travaux de fin de semaine - Avenue des Pins et du boulevard Saint-Laurent - le 29 janvier et le 5 février (in French) [PDF 381 KB]
- Projet des Pins - Reprise des travaux à l'intersection des Pins et Saint-Laurent - Dès le 23 janvier 2023 [PDF 382 KB]
- Projet des Pins - Début des travaux (Lot 2, entre Saint-Laurent et du Parc) - Avril 2022 (in French) [PDF 811 KB]
- Projet des Pins - Lettre en amont (Lot 2, entre Saint-Laurent et du Parc) - Avril 2022 (in French) [PDF 1 MB]
- Avenue des Pins project - Upstream letter - july 2021 [PDF 461 KB]
Quick search
Need help?
Contact us if you have questions.
Are you sure you want to leave this page?
This page is not available in English. You will be redirected to the English home page.