New water mains will be built under Boulevard de Pierrefonds and Boulevard Jacques-Bizard to make the drinking water supply in Dollard-des-Ormeaux and L’île-Bizard more reliable.

Access will be maintained at all times in most cases. To minimize traffic impacts, major intersections may be closed on some weekends, and excavation work will be kept to a minimum. 

Everything you need to know about the project

When? 

Start: Winter 2024 

Duration: About 2 years 

Where? 

  • Boulevard de Pierrefonds, between Rue Sainte-Anne and Boulevard Saint-Jean

  • Boulevard Jacques-Bizard, between Boulevard de Pierrefonds and Boulevard Gouin

Why? 

Provide enough drinking water for homes, businesses, industries and fire hydrants, at sufficient water pressure.

Pourquoi? 

Assurer une quantité et une pression d’eau suffisantes pour l’alimentation en eau potable pour les résidences, commerces, industries et les bornes d’incendie.

Virtual information session