Construction on Rue De Salaberry and Rue Marsan
Last updated October 9, 2024
Reading time: 2 min
Redevelopment and infrastructure work planned in Ahuntsic-Cartierville will affect 2 areas of Rue De Salaberry, Rue Marsan and the Highway 15 ramps.
The goal is to provide a quality road network, sustainable water and sewer systems and a pleasant and secure living environment.
All about the project
When?
Summer 2024 to fall 2025
Where?
- Rue De Salaberry, between Rue Filion and Avenue De Poutrincourt
- Rue Marsan, between Rue Forbes and Rue De Salaberry
- Rue De Salaberry, between Rue Frigon and Avenue du Bois-de-Boulogne
Construction planned on Rue De Salaberry between Rue Filion and Avenue De Poutrincourt, and Rue Marsa between Rue Forbes and Rue De Salaberry.
What?
- Upgrading of collector sewer and secondary water mains
- Rebuilding storm sewers and water mains
- Replacement of lead service lines for notified properties
- Sidewalk repairs
- Road paving
- Building medians, concrete islands and curbs
- Adding guardrails and tree pits on Highway 15
- Planting more than 350 trees and 700 plants
- Upgrading lighting and traffic lights at intersections
- Upgradingthe Commission des services électriques de Montréal (CSEM) network
- Reconfiguration of the highway network (A-15)
Why ?
The project aims to:
- Resolve recurring problems of sewer backup during heavy rains and issues of roadway heave under the viaduct
- Avoid closing the street under the viaduct for emergency repairs
- Reduce the speed of westbound traffic on Rue De Salaberry (from Autoroute 15)
- Improve safety for all users of Rue De Salaberry.
Construction planned on Rue De Salaberry between Rue Frigon and Avenue du Bois-de-Boulogne
What?
- Rebuilding sewer and secondary water mains
- Rebuilding roadway and sidewalks
- Building curb extensions with drainage and planting pits
- Installing new street lights and upgrading traffic lights
- Bell infrastructure work
Why ?
The project aims to:
- Rehabilitate sewer and water pipes
- Build curb extensions for safer travel
- Green the area
Obstructions and construction sites
Check out this map to locate obstructions caused by construction sites related to this project.
Construction notices
See the most recent notices.
- PDF file Avis de travaux – changement d’entrave - rues de Salaberry et Marsan – 15 juillet 2024 (in French) [PDF 211 KB]
- PDF file Avis de début de travaux – rue De Salaberry entre Frigon et Bois-de-Boulogne – 18 juin 2024 (in French) [PDF 312 KB]
- PDF file Avis de début de travaux - rues De Salaberry et Marsan - 2 juillet 2024 (in French) [PDF 305 KB]
Information evening
Did you miss the information evening on the construction on Rue De Salaberry? Watch it here:
Quick search
Need help?
Contact us if you have questions.
Are you sure you want to leave this page?
This page is not available in English. You will be redirected to the English home page.