Add doors and windows or replacing them with models that have different dimensions

Last updated November 8, 2024

Want to add a window to the façade on your building in Montréal, or replace a door in your house with a larger or smaller model? You must comply with the regulations in force, and you are required to obtain a permit.

In each Montréal borough, a permit is required to change the size of existing door or window openings and create new openings.

You are required to comply with natural lighting and ventilation standards. Some buildings also require compliance with energy efficiency standards.

In addition, some areas and properties are subject to particular standards to preserve the neighbourhood’s historic, architectural or landscape value. Additional documentation, such as a Site Planning and Architectural Integration Plan (SPAIP), may be required.

My borough

Shows borough content for
Find a borough to filter the list of search content.

No borough selected.

You must obtain a permit to add an exterior door or window, or to replace one with a different model or of different dimensions.

Rules to follow

  • Natural lighting requirements for a room are determined by its size and use.
  • Ventilation requirements for a room are determined by its size and use.
  • Ecological energy standards must be respected.
  • The maximum authorized percentage of openings in a wall depends on its distance from a property line and is determined by the Québec Construction Code.

Additional fees may apply if your building or the area in which it is located has historic value or is subject to specific architectural standards.

Contact the permit counter to verify the rules applicable to your situation.

Permit fees

Processing fees for permit applications vary based on the projected cost of the work. You will be required to pay $9.80 for every $1,000 of work.

Regardless of the amount of work, you will be required to pay a minimum:

  • $161 for a strictly residential building
  • $473 for a commercial, industrial, institutional or mixed-use building

The projected costs must include all fees associated with the work (ex: plans, labour, equipment), taxes included.

Additional fees may apply if your building or the area in which it is located has historic value or is subject to specific architectural standards.

Fees are non-refundable.

Further reading: The cost of a renovation permit

Required documents

The following documents are required to process your application:

  • bid or cost estimate for the work, including taxes
  • certificate of location
  • manufacturer’s documentation or technical sheet
  • recent colour photo of the façades on the buildings next door
  • recent colour photo of the façades affected by the work
  • plan showing the dimensions of the rooms affected by the work to ensure compliance with natural lighting and ventilation standards
  • plan showing the dimensions of balconies, terraces and other projections directly above the openings affected by the work
  • drawing of the building wall (elevation plan) on which the openings will be changed or added, showing the current openings and the projected work, including the dimensions
  • building specification sheet
  • structure plan approved by a professional if required by law 
  • calculation of the exposing building face if a window is to be enlarged or added
  • any other document required to process the application

If the work is done on a condominium:

  • letter of authorization from each owner or resolution from the condominium syndicate

If you are a representative:

  • power of attorney authorizing you to act on behalf of the owner

Further reading: How to obtain the documents required to apply for a permit

Communication channels

Submit your renovation permit applications all at once (building interior, roof, doors and windows, exterior siding, projections such as stairs, balconies and terraces).

Payment method

  • Credit card (MasterCard, Visa)

You need an account on montreal.ca to use this service.

555 Rue Chabanel Ouest
Suite 600
Montréal, QC H2N 2H8

Legislation

You must obtain a permit to add an exterior door or window, or to replace one with a different model or of different dimensions.

Permit fees

Processing fees for permit applications vary based on the projected cost of the work. You will be required to pay $9.80 for every $1,000 of work.

Regardless of the amount of work, you will be required to pay a minimum:

  • $161 for a strictly residential building
  • $473 for a commercial, industrial, institutional or mixed-use building

The projected costs must include all fees associated with the work (ex: plans, labour, equipment), taxes included.

Additional fees may apply if your building or the area in which it is located has historic value or is subject to specific architectural standards.

Fees are non-refundable.

Further reading: The cost of a renovation permit

Required documents

The following documents are required to process your application:

  • bid or cost estimate for the work, including taxes
  • certificate of location
  • manufacturer’s documentation or technical sheet indicating that the new doors and windows are ENERGY STAR qualified
  • recent colour photo of the façades on the buildings next door
  • recent colour photo of the façades affected by the work
  • plan showing the dimensions of the rooms affected by the work to ensure compliance with natural lighting and ventilation standards
  • plan showing the dimensions of balconies, terraces and other projections directly above the openings affected by the work
  • drawing of the building wall (elevation plan) on which the openings will be changed or added, showing the current openings and the projected work, including the dimensions
  • building specification sheet
  • structure plan approved by a professional if required by law
  • any other document required to process the application

If the work is done on a condominium:

  • letter of authorization from each owner or resolution from the condominium syndicate

If you are a representative:

  • power of attorney authorizing you to act on behalf of the owner

Further reading: How to obtain the documents required to apply for a permit

Submit an application

In person

By appointment only.

7171 Rue Bombardier
Second floor
Montréal, QC H1J 2E9

Any questions?

For information or to take an appointment, contact us:

  1. By phone: 514 493-5115
  2. By email: [email protected]

Legislation

You must obtain a permit to add an exterior door or window, or to replace one with a different model or of different dimensions.

Permit fees

Processing fees for permit applications vary based on the projected cost of the work. You will be required to pay $9.80 for every $1,000 of work.

Regardless of the amount of work, you will be required to pay a minimum:

  • $161 for a strictly residential building
  • $473 for a commercial, industrial, institutional or mixed-use building

The projected costs must include all fees associated with the work (ex: plans, labour, equipment), taxes included.

Additional fees may apply if your building or the area in which it is located has historic value or is subject to specific architectural standards.

Fees are non-refundable.

Further reading: The cost of a renovation permit

Required documents

The following documents are required to process your application:

  • bid or cost estimate for the work, including taxes
  • certificate of location
  • manufacturer’s documentation or technical sheet
  • recent colour photo of the façades on the buildings next door
  • recent colour photo of the façades affected by the work
  • plan showing the dimensions of the rooms affected by the work to ensure compliance with natural lighting and ventilation standards
  • plan showing the dimensions of balconies, terraces and other projections directly above the openings affected by the work
  • drawing of the building wall (elevation plan) on which the openings will be changed or added, showing the current openings and the projected work, including the dimensions
  • building specification sheet
  • structure plan approved by a professional if required by law
  • any other document required to process the application

If the work is done on a condominium:

  • letter of authorization from each owner or resolution from the condominium syndicate

If you are a representative:

  • power of attorney authorizing you to act on behalf of the owner

Further reading: How to obtain the documents required to apply for a permit

Communication channels

Submit your renovation permit applications all at once (building interior, roof, doors and windows, exterior siding, projections such as stairs, balconies and terraces).

Payment method

  • Credit card (MasterCard, Visa)

You need an account on montreal.ca to use this service.

Point of service

5160 Boulevard Décarie
Montréal, QC H3X 2H9

Legislation

You must obtain a permit to add an exterior door or window, or to replace one with a different model or of different dimensions.

Permit fees

Processing fees for permit applications vary based on the projected cost of the work. You will be required to pay $9.80 for every $1,000 of work.

Regardless of the amount of work, you will be required to pay a minimum:

  • $161 for a strictly residential building
  • $473 for a commercial, industrial, institutional or mixed-use building

The projected costs must include all fees associated with the work (ex: plans, labour, equipment), taxes included.

Additional fees may apply if your building or the area in which it is located has historic value or is subject to specific architectural standards.

Fees are non-refundable.

Further reading: The cost of a renovation permit

Required documents

The following documents are required to process your application:

  • bid or cost estimate for the work, including taxes
  • certificate of location
  • manufacturer’s documentation or technical sheet
  • recent colour photo of the façades on the buildings next door
  • recent colour photo of the façades affected by the work
  • plan showing the dimensions of the rooms affected by the work to ensure compliance with natural lighting and ventilation standards
  • plan showing the dimensions of balconies, terraces and other projections directly above the openings affected by the work
  • drawing of the building wall (elevation plan) on which the openings will be changed or added, showing the current openings and the projected work, including the dimensions
  • building specification sheet
  • structure plan approved by a professional if required by law
  • any other document required to process the application

If the work is done on a condominium:

  • letter of authorization from each owner or resolution from the condominium syndicate

If you are a representative:

  • power of attorney authorizing you to act on behalf of the owner

Further reading: How to obtain the documents required to apply for a permit

Communication channels

Submit your renovation permit applications all at once (building interior, roof, doors and windows, exterior siding, projections such as stairs, balconies and terraces).

Payment method

  • Credit card (MasterCard, Visa)

You need an account on montreal.ca to use this service.

Point of service

1800 Boulevard Saint-Joseph
Montréal, QC H8S 2N4

Legislation

You must obtain a permit to add an exterior door or window, or to replace one with a different model or of different dimensions.

Permit fees

Processing fees for permit applications vary based on the projected cost of the work. You will be required to pay $9.80 for every $1,000 of work.

Regardless of the amount of work, you will be required to pay a minimum:

  • $161 for a strictly residential building
  • $473 for a commercial, industrial, institutional or mixed-use building

The projected costs must include all fees associated with the work (ex: plans, labour, equipment), taxes included.

Additional fees may apply if your building or the area in which it is located has historic value or is subject to specific architectural standards.

Fees are non-refundable.

Further reading: The cost of a renovation permit

Required documents

The following documents are required to process your application:

  • bid or cost estimate for the work, including taxes
  • certificate of location
  • manufacturer’s documentation or technical sheet
  • recent colour photo of the façades on the buildings next door
  • recent colour photo of the façades affected by the work
  • plan showing the dimensions of the rooms affected by the work to ensure compliance with natural lighting and ventilation standards
  • plan showing the dimensions of balconies, terraces and other projections directly above the openings affected by the work
  • drawing of the building wall (elevation plan) on which the openings will be changed or added, showing the current openings and the projected work, including the dimensions
  • building specification sheet
  • structure plan approved by a professional if required by law
  • any other document required to process the application

If the work is done on a condominium:

  • letter of authorization from each owner or resolution from the condominium syndicate

If you are a representative:

  • power of attorney authorizing you to act on behalf of the owner

Further reading: How to obtain the documents required to apply for a permit

Communication channels

Submit your renovation permit applications all at once (building interior, roof, doors and windows, exterior siding, projections such as stairs, balconies and terraces).

Payment method

  • Credit card (MasterCard, Visa)

You need an account on montreal.ca to use this service.

Point of service

55 Avenue Dupras
Montréal, QC H8R 4A8

By appointment only.

Legislation

As a general rule, you are required to keep the original openings on the visible façades of the building.

Please contact the permit counter for further information.

You must obtain a permit to add an exterior door or window, or to replace one with a different model or of different dimensions.

Permit fees

Processing fees for permit applications vary based on the projected cost of the work. You will be required to pay $9.80 for every $1,000 of work.

An additional fee of $3.50 applies for every $1,000 of work for the review of restoration, replacement or transformation work carried out on a part of a building visible from a public street. 

Regardless of the amount of work, you will be required to pay a minimum:

  • $161 for a strictly residential building
  • $473 for a commercial, industrial, institutional or mixed-use building

The projected costs must include all fees associated with the work (ex: plans, labour, equipment), taxes included.

Additional fees may apply if your building or the area in which it is located has historic value or is subject to specific architectural standards.

Fees are non-refundable.

Further reading: The cost of a renovation permit

Required documents

The following documents are required to process your application:

  • bid or cost estimate for the work, including taxes
  • certificate of location
  • manufacturer’s documentation or technical sheet
  • recent colour photo of the façades on the buildings next door
  • recent colour photo of the façades affected by the work
  • plan showing the dimensions of the rooms affected by the work to ensure compliance with natural lighting and ventilation standards
  • plan showing the dimensions of balconies, terraces and other projections directly above the openings affected by the work
  • drawing of the building wall (elevation plan) on which the openings will be changed or added, showing the current openings and the projected work, including the dimensions
  • building specification sheet
  • structure plan approved by a professional if required by law
  • any other document required to process the application

If the work is done on a condominium:

  • letter of authorization from each owner or resolution from the condominium syndicate

If you are a representative:

  • power of attorney authorizing you to act on behalf of the owner

Further reading: How to obtain the documents required to apply for a permit

Communication channels

Submit your renovation permit applications all at once (building interior, roof, doors and windows, exterior siding, projections such as stairs, balconies and terraces).

The person responsible for processing your application will contact you within a maximum of 14 days of submission. The time required to issue a permit depends on the nature of the application, its complexity and the season.

Payment method

  • Credit card (MasterCard, Visa)

You need an account on montreal.ca to use this service.

Point of service

201 Avenue Laurier Est
Fifth floor
Montréal, QC H2T 3E6

Legislation

Permit

You must obtain a permit to add a door or window, or if you want to replace them with models of different dimensions.

It is recommended that you receive your permit before signing a contract for your renovation project.

Replacement by doors or windows of different dimensions is only allowed on a wall that is not considered to be an exterior wall.

Exterior walls

All exterior walls are included in this requirement, except one that leads to a rear yard.

However, if your property is an architecturally significant building, or if it is located near the Canal de Lachine, all exterior walls are subject to the requirement.

Exceptions

  • Addition of an opening is allowed if a dwelling or an additional premises is added to a building, as long as the new component complies with the architectural characteristics identified in Appendix B for the particular landscape unit.
  • You are not allowed to fill in the side window or transom window to a door.
  • Addition of a window below the ground floor that respects the alignment of a window located on the ground floor is allowed, except for a wall opening onto a semi-basement entrance.

Rules to follow

  • Use of polyvinyl chloride (PVC) on the exterior of windows, including the frames, is prohibited throughout the Sud-Ouest. However, you can use a hybrid model.
  • In the case of partial or complete filling in of an opening on a rear wall, the lintel and sill must be removed and the same wall facing as that of the adjacent section of the wall must be used, while respecting the masonry treatment. Does not apply to an opening to a crawl space.
  • All of a home’s skylights, windows and patio doors must be Energy Star® certified according to the criteria set out by Natural Resources Canada for climate zone 2 (minimum energy efficiency of 29)
  • Original glass block must be preserved and reinserted in the opening
  • Original stained-glass windows must be preserved and reinserted in the opening
  • Except in the case of an architecturally significant building, modification of the colour of an original architectural component is allowed
  • Side windows, door transoms and carriage doors must not be blocked. 

Documentation 

For more information, read Appendices F, O and B of the Urban planning by-law, below. 

  • Appendix F: Existing door and window types and authorized replacement models 
  • Appendix O: Principal architectural typologies found in the borough 
  • Appendix B: Development context, dominant characteristics of the landscape unit, architectural characteristics of buildings, properties and areas of significance, by landscape unit 

For further information

To learn details about the standards related to the location of your property, select the “Zonage et PIIIA” filter on the interactive map (in French).

Permit fees

Processing fees for permit applications vary based on the projected cost of the work. You will be required to pay $9.80 for every $1,000 of work.

Regardless of the amount of work, you will be required to pay a minimum:

  • $161 for a strictly residential building
  • $473 for a commercial, industrial, institutional or mixed-use building

The projected costs must include all fees associated with the work (ex: plans, labour, equipment), taxes included.

Additional fees may apply if your building or the area in which it is located has historic value. In this case, work is subject to the By-law on Site Planning and Architectural Integration Plans and must follow special architectural requirements.

Fees are non-refundable.

Further reading: The cost of a renovation permit

Required documents

The following documents are required to process your application:

  • bid or cost estimate for the work, including taxes
  • certificate of location
  • manufacturer’s documentation or technical sheet indicating the nature and colour of the material
  • recent colour photo of the façades on the buildings next door
  • recent colour photo of the façades affected by the work
  • plan showing the dimensions of the rooms affected by the work to ensure compliance with natural lighting and ventilation standards
  • plan showing the dimensions of balconies, terraces and other projections directly above the openings affected by the work
  • drawing of the building wall (elevation plan) on which the openings will be changed or added, showing the current openings and the projected work, including the dimensions
  • building specification sheet
  • structure plan approved by a professional if required by law
  • any other document required to process the application

If the work is done on a condominium:

  • letter of authorization from each owner or resolution from the condominium syndicate

If you are a representative:

  • power of attorney authorizing you to act on behalf of the owner

Further reading: How to obtain the documents required to apply for a permit

Learn more

For more information, please contact the permit counter.

Apply

Submit your renovation permit applications all at once (building interior, roof, doors and windows, exterior siding, projections such as stairs, balconies and terraces).

To access this service, you need an account on montreal.ca.

Payment method

  • Credit card (MasterCard, Visa)

By appointment

815 Rue Bel-Air
First floor
Montréal, QC H4C 2K4

If you are unable to submit your application online or by e-mail, please e-mail us to make an appointment. No permit application will be processed on site without an appointment and all required documents.

Submit your request by sending us your documents by e-mail. No request can be processed without all the necessary documents.

Legislation

You must obtain a permit to add an exterior door or window, or to replace one with a different model or of different dimensions.

Permit fees

Processing fees for permit applications vary based on the projected cost of the work. You will be required to pay $9.80 for every $1,000 of work.

Regardless of the amount of work, you will be required to pay a minimum:

  • $161 for a strictly residential building
  • $473 for a commercial, industrial, institutional or mixed-use building

The projected costs must include all fees associated with the work (ex: plans, labour, equipment), taxes included.

Additional fees may apply if your building or the area in which it is located has historic value or is subject to specific architectural standards.

Fees are non-refundable.

Further reading: The cost of a renovation permit

Required documents

The following documents are required to process your application:

  • bid or cost estimate for the work, including taxes
  • certificate of location
  • manufacturer’s documentation or technical sheet indicating the nature and colour of the material
  • recent colour photo of the façades on the buildings next door
  • recent colour photo of the façades affected by the work
  • plan showing the dimensions of the rooms affected by the work to ensure compliance with natural lighting and ventilation standards
  • plan showing the dimensions of balconies, terraces and other projections directly above the openings affected by the work
  • drawing of the building wall (elevation plan) on which the openings will be changed or added, showing the current openings and the projected work, including the dimensions
  • building specification sheet
  • structure plan approved by a professional if required by law
  • any other document required to process the application

If the work is done on a condominium:

  • letter of authorization from each owner or resolution from the condominium syndicate

If you are a representative:

  • power of attorney authorizing you to act on behalf of the owner

Further reading: How to obtain the documents required to apply for a permit

Communication channels

Submit your renovation permit applications all at once (building interior, roof, doors and windows, exterior siding, projections such as stairs, balconies and terraces).

Payment method

  • Credit card (MasterCard, Visa)

You need an account on montreal.ca to use this service.

Point of service

15795, boulevard Gouin Ouest
(on the 2nd floor, rear door of the citizen reception and public safety office)
Montréal, QC H9H 1C5

Legislation

You must obtain a permit to add an exterior door or window, or to replace one with a different model or of different dimensions.

Permit fees

Processing fees for permit applications vary based on the projected cost of the work. You will be required to pay $9.80 for every $1,000 of work.

Regardless of the amount of work, you will be required to pay a minimum:

  • $161 for a strictly residential building
  • $473 for a commercial, industrial, institutional or mixed-use building

The projected costs must include all fees associated with the work (ex: plans, labour, equipment), taxes included.

Additional fees may apply if your building or the area in which it is located has historic value or is subject to specific architectural standards.

Fees are non-refundable.

Further reading: The cost of a renovation permit

Required documents

The following documents are required to process your application:

  • bid or cost estimate for the work, including taxes
  • certificate of location
  • manufacturer’s documentation or technical sheet
  • recent colour photo of the façades on the buildings next door
  • recent colour photo of the façades affected by the work
  • plan showing the dimensions of the rooms affected by the work to ensure compliance with natural lighting and ventilation standards
  • plan showing the dimensions of balconies, terraces and other projections directly above the openings affected by the work
  • drawing of the building wall (elevation plan) on which the openings will be changed or added, showing the current openings and the projected work, including the dimensions
  • building specification sheet
  • structure plan approved by a professional if required by law
  • any other document required to process the application

If the work is done on a condominium:

  • letter of authorization from each owner or resolution from the condominium syndicate

If you are a representative:

  • power of attorney authorizing you to act on behalf of the owner

Further reading: How to obtain the documents required to apply for a permit

Communication channels

Submit your renovation permit applications all at once (building interior, roof, doors and windows, exterior siding, projections such as stairs, balconies and terraces).

Payment method

  • Credit card (MasterCard, Visa)

You need an account on montreal.ca to use this service.

Point of service

6854 Rue Sherbrooke Est
Montréal, QC H1N 1E1

Legislation

Residential skylights, windows and patio doors must be ENERGY STAR® certified (specification issued by Natural Resources Canada for climate zone 2).

Permit fees

Processing fees for permit applications vary based on the projected cost of the work. You will be required to pay $9.80 for every $1,000 of work.

Regardless of the amount of work, you will be required to pay a minimum:

  • $161 for a strictly residential building
  • $473 for a commercial, industrial, institutional or mixed-use building

The projected costs must include all fees associated with the work (ex: plans, labour, equipment), taxes included.

Additional fees may apply if your building or the area in which it is located has historic value or is subject to specific architectural standards.

Fees are non-refundable.

Further reading: The cost of a renovation permit

Required documents

The following documents are required to process your application:

  • bid or cost estimate for the work, including taxes
  • certificate of location
  • manufacturer’s documentation or technical sheet
  • plan showing the dimensions of the rooms affected by the work to ensure compliance with natural lighting and ventilation standards
  • plan showing the dimensions of balconies, terraces and other projections directly above the openings affected by the work
  • drawing of the building wall (elevation plan) on which the openings will be changed or added, showing the current openings and the projected work, including the dimensions
  • building specification sheet
  • structure plan approved by a professional if required by law
  • any other document required to process the application

If your building has historic value, you are also required to provide the following documents:

  • recent colour photo of the façades on the buildings next door
  • recent colour photo of the façades affected by the work

If the work is done on a condominium:

  • letter of authorization from each owner or resolution from the condominium syndicate

If you are a representative:

  • power of attorney authorizing you to act on behalf of the owner

Further reading: How to obtain the documents required to apply for a permit

Communication channels

Submit your renovation permit applications all at once (building interior, roof, doors and windows, exterior siding, projections such as stairs, balconies and terraces).

Payment method

  • Credit card (MasterCard, Visa)

You need an account on montreal.ca to use this service.

Point of service

4241 Place de l'Hôtel-de-Ville
Montréal, QC H1H 1S4

Legislation

These applications are subject to a Site Planning and Architectural Integration Program (SPAIP). Extra fees and waiting periods apply, and additional documents are required.

We recommend that you go to the permit counter before you undertake the work.

You must obtain a permit to add an exterior door or window, or to replace one with a different model or of different dimensions.

Permit fees

Processing fees for permit applications vary based on the projected cost of the work. You will be required to pay $9.80 for every $1,000 of work.

Regardless of the amount of work, you will be required to pay a minimum:

  • $160.45 for a strictly residential building
  • $472.16 for a commercial, industrial, institutional or mixed-use building

The projected costs must include all fees associated with the work (ex: plans, labour, equipment), taxes included.

Additional fees may apply if your building or the area in which it is located has historic value or is subject to specific architectural standards.

Fees are non-refundable.

Further reading: The cost of a renovation permit

Required documents

The following documents are required to process your application:

  • bid or cost estimate for the work, including taxes
  • certificate of location
  • manufacturer’s documentation or technical sheet
  • recent colour photo of the façades on the buildings next door
  • recent colour photo of the façades affected by the work
  • plan showing the dimensions of the rooms affected by the work to ensure compliance with natural lighting and ventilation standards
  • plan showing the dimensions of balconies, terraces and other projections directly above the openings affected by the work
  • drawing of the building wall (elevation plan) on which the openings will be changed or added, showing the current openings and the projected work, including the dimensions
  • building specification sheet
  • structure plan approved by a professional if required by law
  • sample of the material showing its shape and colour
  • photo montage, 3D perspective drawings or colour elevation drawing of the completed project

If the work is done on a condominium:

  • letter of authorization from each owner or resolution from the condominium syndicate

If you are a representative:

  • power of attorney authorizing you to act on behalf of the owner

Further reading: How to obtain the documents required to apply for a permit

Communication channels

Submit your renovation permit applications all at once (building interior, roof, doors and windows, exterior siding, projections such as stairs, balconies and terraces).

Payment method

  • Credit card (MasterCard, Visa)

You need an account on montreal.ca to use this service.

Point of service

1431 Avenue Van Horne, 2nd floor
Montréal, QC H2V 1K9

Legislation

You must obtain a permit to add an exterior door or window, or to replace one with a different model or of different dimensions.

Permit fees

Processing fees for permit applications vary based on the projected cost of the work. You will be required to pay $9.80 for every $1,000 of work.

Regardless of the amount of work, you will be required to pay a minimum:

  • $161 for a strictly residential building
  • $473 for a commercial, industrial, institutional or mixed-use building

The projected costs must include all fees associated with the work (ex: plans, labour, equipment), taxes included.

Additional fees may apply if your building or the area in which it is located has historic value or is subject to specific architectural standards.

Fees are non-refundable.

Further reading: The cost of a renovation permit

Required documents

The following documents are required to process your application:

  • bid or cost estimate for the work, including taxes
  • certificate of location
  • manufacturer’s documentation or technical sheet
  • recent colour photo of the façades on the buildings next door
  • recent colour photo of the façades affected by the work
  • plan showing the dimensions of the rooms affected by the work to ensure compliance with natural lighting and ventilation standards
  • plan showing the dimensions of balconies, terraces and other projections directly above the openings affected by the work
  • drawing of the building wall (elevation plan) on which the openings will be changed or added, showing the current openings and the projected work, including the dimensions
  • building specification sheet
  • structure plan approved by a professional if required by law
  • sample of the material showing its shape and colour
  • photo montage, 3D perspective drawings or elevation drawing of the completed project

If the work is done on a condominium:

  • letter of authorization from each owner or resolution from the condominium syndicate

If you are a representative:

  • power of attorney authorizing you to act on behalf of the owner

Further reading: How to obtain the documents required to apply for a permit

Communication channels

Submit your renovation permit applications all at once (building interior, roof, doors and windows, exterior siding, projections such as stairs, balconies and terraces).

Payment method

  • Credit card (MasterCard, Visa)

You need an account on montreal.ca to use this service.

Point of service

13665 Boulevard de Pierrefonds
Montréal, QC H9A 2Z4

Legislation

You must obtain a permit to add an exterior door or window, or to replace one with a different model or of different dimensions.

Permit fees

Processing fees for permit applications vary based on the projected cost of the work. You will be required to pay $9.80 for every $1,000 of work.

Regardless of the amount of work, you will be required to pay a minimum:

  • $161 for a strictly residential building
  • $473 for a commercial, industrial, institutional or mixed-use building

The projected costs must include all fees associated with the work (ex: plans, labour, equipment), taxes included.

Additional fees may apply if your building or the area in which it is located has historic value or is subject to specific architectural standards.

Fees are non-refundable.

Further reading: The cost of a renovation permit

Required documents

The following documents are required to process your application:

  • bid or cost estimate for the work, including taxes
  • certificate of location
  • manufacturer’s documentation or technical sheet
  • plan showing the dimensions of the rooms affected by the work to ensure compliance with natural lighting and ventilation standards
  • plan showing the dimensions of balconies, terraces and other projections directly above the openings affected by the work
  • drawing of the building wall (elevation plan) on which the openings will be changed or added, showing the current openings and the projected work, including the dimensions
  • building specification sheet
  • structure plan approved by a professional if required by law
  • any other document required to process the application

If the work is done on a condominium:

  • letter of authorization from each owner or resolution from the condominium syndicate

If you are a representative:

  • power of attorney authorizing you to act on behalf of the owner

Further reading: How to obtain the documents required to apply for a permit

Communication channels

Submit your renovation permit applications all at once (building interior, roof, doors and windows, exterior siding, projections such as stairs, balconies and terraces).

Payment method

  • Credit card (MasterCard, Visa)

You need an account on montreal.ca to use this service.

Point of service

12090 Rue Notre-Dame Est
Montréal, QC H1B 2Z1

Legislation

Additional requirements in certain areas

In the borough’s heritage areas, replacement elements must have the shape and appearance of those original to the building.

This restriction applies to certain building façades, particularly if they are visible from the street.

To find out if your building is located in one of these areas, view information on the Rosemont–La Petite-Patrie interactive map by following these steps:

  1. Check the “Urbanisme” box in the right-hand column
  2. Input your address in French (e.g. 6244 Boulevard Saint-Laurent) in the box in the top left corner of the map
  3. Click the search result
  4. Click the “Cliquez pour ouvrir” link
  5. You will now have access to a data sheet indicating if your property is located in a heritage area (secteur de valeur patrimonial).

To learn what models are authorized, view the Replacement Doors and Windows document (Portes et fenêtres de remplacement) below.

We recommend that you visit the permit counter for a preliminary evaluation to validate authorized models.

Permit fees

Processing fees for permit applications vary based on the projected cost of the work. You will be required to pay $9.80 for every $1,000 of work.

Regardless of the amount of work, you will be required to pay a minimum:

  • $161 for a strictly residential building
  • $473 for a commercial, industrial, institutional or mixed-use building

The projected costs must include all fees associated with the work (ex: plans, labour, equipment), taxes included.

Additional fees may apply if your building or the area in which it is located has historic value or is subject to specific architectural standards.

Fees are non-refundable.

Further reading: The cost of a renovation permit

Documents

Required documents

The following documents are required to process your application:

  • bid or cost estimate for the work, including taxes
  • certificate of location
  • manufacturer’s documentation or technical sheet showing the window model (sash, casement, awning)
  • plan showing the dimensions of the rooms affected by the work to ensure compliance with natural lighting and ventilation standards
  • plan showing the dimensions of balconies, terraces and other projections directly above the openings affected by the work
  • drawing of the building wall (elevation plan) on which the openings will be changed or added, showing the current openings and the projected work
  • building specification sheet
  • structure plan approved by a professional if required by law
  • any other document required to process the application

If the work is done on a condominium:

  • letter of authorization from each owner or resolution from the condominium syndicate

If you are a representative:

  • power of attorney authorizing you to act on behalf of the owner

Further reading: How to obtain the documents required to apply for a permit

Communication channels

Submit your renovation permit applications all at once (building interior, roof, doors and windows, exterior siding, projections such as stairs, balconies and terraces).

Payment method

  • Credit card (MasterCard, Visa)

You need an account on montreal.ca to use this service.

Point of service

5650 Rue D'Iberville
Second floor
Montréal, QC H2G 2B3

Point of service

5650 Rue D'Iberville
Second floor
Montréal, QC H2G 2B3

Methods of payment

  • Postal money order payable to “Ville de Montréal”
  • Cheque payable to “Ville de Montréal”

Send your application form shown above, your documents and your payment.

Look at our guide to know more about authorized models.

Legislation

You must obtain a permit to add an exterior door or window, or to replace one with a different model or of different dimensions.

Permit fees

Evaluation fees for the permit application vary depending on the estimated cost of the work. You must pay $9.80 per $1,000 of work. No matter the cost of the work, you must pay a minimum of $161. 

Additional fees may apply if your building, or the area in which it is located, is designated as a historic area or is subject to special architectural standards

Fees are non-refundable.

Further reading: The cost of a renovation permit

Application on hold

If the documents you provide are incomplete or some are missing, the application will be put on hold. It will be processed once all documents have been submitted. 

Application processing time

Between 30 and 60 days after all documents have been received. 

Construction permit validity

  • You must begin work no later than three months after receiving your permit. 
  • Your permit is valid for six months from the time work begins.

Required documents

The following documents are required in order for us to assess your application: 

  • Two copies of professional quality scale drawings that include: 
    • Plans of the floors that will be affected by the alterations. 
    • Elevation views of the exterior walls that will be affected by the alterations, if required. 
    • Certificate of location that shows the location of exterior walls, if required. 
    • Wall cuts and construction details. 

Further reading: How to obtain the documents required to apply for a permit

An architectural implementation and integration plan permit may be required for certain types of work. Contact the Division des permis et des inspections to find out whether this applies to your project.

Communication channels

311

Outside of Montréal: 514-872-0311

Monday to Friday: From 8:30 a.m. to 8:30 p.m.
Saturday, Sunday and public holidays: From 9 a.m. to 5 p.m.

Point of service

777, boulevard Marcel-Laurin
Saint-Laurent, QC H4M 2M7

Point of service

777, boulevard Marcel-Laurin
Saint-Laurent, QC H4M 2M7

Legislation

You must obtain a permit to add an exterior door or window, or to replace one with a different model or of different dimensions.

Approval from the urban planning advisory committee (CCU) is required to change the openings on the front façade of the following buildings:

  • single-family homes
  • multiplexes
  • commercial, industrial or mixed-use buildings, if they are semi-detached or in rows

Extra fees apply, and additional documents are required.

Permit fees

Processing fees for permit applications vary based on the projected cost of the work. You will be required to pay $9.80 for every $1,000 of work.

Regardless of the amount of work, you will be required to pay a minimum:

  • $161 for a strictly residential building
  • $473 for a commercial, industrial, institutional or mixed-use building

The projected costs must include all fees associated with the work (ex: plans, labour, equipment), taxes included.

Additional fees may apply if your building or the area in which it is located has historic value or is subject to specific architectural standards.

Fees are non-refundable.

Further reading: The cost of a renovation permit

Required documents

The following documents are required to process your application:

  • bid or cost estimate for the work, including taxes
  • certificate of location
  • manufacturer’s documentation or technical sheet 
  • plan showing the dimensions of the rooms affected by the work to ensure compliance with natural lighting and ventilation standards
  • plan showing the dimensions of balconies, terraces and other projections directly above the openings affected by the work
  • drawing of the building wall (elevation plan) on which the openings will be changed or added, showing the current openings and the projected work, including the dimensions
  • building specification sheet
  • structure plan approved by a professional if required by law
  • any other document required to process the application

If your application must be approved by the urban planning advisory committee (CCU), you must also provide the following documents:

  • recent colour photo of the façades on the buildings next door
  • recent colour photo of the façades affected by the work
  • colour plan of the building

If the work is done on a condominium:

  • letter of authorization from each owner or resolution from the condominium syndicate

If you are a representative:

  • power of attorney authorizing you to act on behalf of the owner

Further reading: How to obtain the documents required to apply for a permit

Communication channels

Submit your renovation permit applications all at once (building interior, roof, doors and windows, exterior siding, projections such as stairs, balconies and terraces).

Payment method

  • Credit card (MasterCard, Visa)

You need an account on montreal.ca to use this service.

8400 Boulevard Lacordaire
Montréal, QC H1R 3B1

Legislation

You must obtain a permit to add an exterior door or window, or to replace one with a different model or of different dimensions.

Permit fees

Processing fees for permit applications vary based on the projected cost of the work. You will be required to pay $9.80 for every $1,000 of work.

Regardless of the amount of work, you will be required to pay a minimum:

  • $161 for a strictly residential building
  • $473 for a commercial, industrial, institutional or mixed-use building

The projected costs must include all fees associated with the work (ex: plans, labour, equipment), taxes included.

Additional fees may apply if your building or the area in which it is located has historic value or is subject to specific architectural standards.

Fees are non-refundable.

Further reading: The cost of a renovation permit

Required documents

The following documents are required to process your application:

  • bid or cost estimate for the work, including taxes
  • certificate of location
  • manufacturer’s documentation or technical sheet 
  • recent colour photo of the façades on the buildings next door
  • recent colour photo of the façades affected by the work
  • plan showing the dimensions of the rooms affected by the work to ensure compliance with natural lighting and ventilation standards
  • plan showing the dimensions of balconies, terraces and other projections directly above the openings affected by the work
  • drawing of the building wall (elevation plan) on which the openings will be changed or added, showing the current openings and the projected work, including the dimensions
  • building specification sheet
  • structure plan approved by a professional if required by law
  • any other document required to process the application

If the work is done on a condominium:

  • letter of authorization from each owner or resolution from the condominium syndicate

If you are a representative:

  • power of attorney authorizing you to act on behalf of the owner

Further reading: How to obtain the documents required to apply for a permit

Communication channels

Submit your renovation permit applications all at once (building interior, roof, doors and windows, exterior siding, projections such as stairs, balconies and terraces).

Payment method

  • Credit card (MasterCard, Visa)

You need an account on montreal.ca to use this service.

Point of service

4555 Rue de Verdun
Suite 109
Montréal, QC H4G 1M4

Legislation

You must obtain a permit to add an exterior door or window, or to replace one with a different model or of different dimensions.

Wait for your permit to be issued before purchasing your materials.

Permit fees

Processing fees for permit applications vary based on the projected cost of the work. You will be required to pay $9.80 for every $1,000 of work.

Regardless of the amount of work, you will be required to pay a minimum:

  • $161 for a strictly residential building
  • $473 for a commercial, industrial, institutional or mixed-use building

The projected costs must include all fees associated with the work (ex: plans, labour, equipment), taxes included.

Additional fees may apply if your building or the area in which it is located has historic value or is subject to specific architectural standards.

Fees are non-refundable.

Further reading: The cost of a renovation permit

Required documents

The following documents are required to process your application:

  • bid or cost estimate for the work, including taxes
  • certificate of location
  • manufacturer’s documentation or technical sheet 
  • recent colour photo of the façades on the buildings next door
  • recent colour photo of the façades affected by the work
  • plan showing the dimensions of the rooms affected by the work to ensure compliance with natural lighting and ventilation standards
  • plan showing the dimensions of balconies, terraces and other projections directly above the openings affected by the work
  • drawing of the building wall (elevation plan) on which the openings will be changed or added, showing the current openings and the projected work, including the dimensions
  • building specification sheet
  • structure plan approved by a professional if required by law
  • any other document required to process the application

If the work is done on a condominium:

  • letter of authorization from each owner or resolution from the condominium syndicate

If you are a representative:

  • power of attorney authorizing you to act on behalf of the owner

Further reading: How to obtain the documents required to apply for a permit

Communication channels

Submit your renovation permit applications all at once (building interior, roof, doors and windows, exterior siding, projections such as stairs, balconies and terraces).

Payment method

  • Credit card (MasterCard, Visa)

You need an account on montreal.ca to use this service.

Point of service

800 Boulevard De Maisonneuve Est
ground floor
Montréal, QC H2L 4L8

Legislation

You must obtain a permit to add an exterior door or window, or to replace one with a different model or of different dimensions.

Permit fees

Processing fees for permit applications vary based on the projected cost of the work. You will be required to pay $9.80 for every $1,000 of work.

Regardless of the amount of work, you will be required to pay a minimum:

  • $161 for a strictly residential building
  • $473 for a commercial, industrial, institutional or mixed-use building

The projected costs must include all fees associated with the work (ex: plans, labour, equipment), taxes included.

Additional fees may apply if your building or the area in which it is located has historic value or is subject to specific architectural standards.

Fees are non-refundable.

Further reading: The cost of a renovation permit

Required documents

The following documents are required to process your application:

  • bid or cost estimate for the work, including taxes
  • certificate of location
  • manufacturer’s documentation or technical sheet 
  • recent colour photo of the façades on the buildings next door
  • recent colour photo of the façades affected by the work
  • plan showing the dimensions of the rooms affected by the work to ensure compliance with natural lighting and ventilation standards
  • plan showing the dimensions of balconies, terraces and other projections directly above the openings affected by the work
  • drawing of the building wall (elevation plan) on which the openings will be changed or added, showing the current openings and the projected work, including the dimensions
  • building specification sheet
  • structure plan approved by a professional if required by law
  • any other document required to process the application

If the work is done on a condominium:

  • letter of authorization from each owner or resolution from the condominium syndicate

If you are a representative:

  • power of attorney authorizing you to act on behalf of the owner

Further reading: How to obtain the documents required to apply for a permit

Communication channels

Submit your renovation permit applications all at once (building interior, roof, doors and windows, exterior siding, projections such as stairs, balconies and terraces).

Payment method

  • Credit card (MasterCard, Visa)

You need an account on montreal.ca to use this service.

Point of service

405 Avenue Ogilvy
Suite 111
Montréal, QC H3N 1M3

Legislation