Obstruction to traffic – Boulevard de Pierrefonds, between Rue Esther-Blondin and Rue Harry-Worth – Pierrefonds-Roxboro
• From 06/02/2025
• Estimated duration: 6 weeks
• Obstruction to traffic on the south side of the road:
- Boulevard de Pierrefonds, between Rue Esther-Blondin and Rue Harry-Worth;
- One lane of traffic per direction will be maintained at all times
- Access to buildings and businesses will be maintained.
• Active work sites:
- Boulevard de Pierrefonds, at the intersection of Rue Paiement
- Boulevard de Pierrefonds, at the intersection of Boulevard Saint-Jean
Schedule:
- Monday to Friday, 7:00 a.m. to 7:00 p.m.;
- Saturday and Sunday, 9:00 a.m. to 7:00 p.m., as needed
• Reason: New water main construction
• Information : https://montreal.ca/en/articles/boulevard-de-pierrefonds-and-boulevard-jacques-bizard-new-water-mains-63246
Need help?
Contact us if you have questions.
Are you sure you want to leave this page?
This page is not available in English. You will be redirected to the English home page.