Repair work on the damaged watermain in Ville-Marie
Last updated November 5, 2024
Reading time: 1 min
Montréal is undertaking repair work on the 84- inch conduit that sustained significant damage on August 16, 2024, in the Centre-Sud are of Ville-Marie borough.
When
From the week of November 3 to December 6, 2024
Where
On Boulevard René-Lévesque, between Rue Parthenais and Avenue De Lorimier.
What
The work will allow for the replacement of a 6-metre segment of the the drinking watermain that has been closed since the event.
- Replacement of the defective part.
- Renewal of secondary waterworks and sewage pipes.
- Renewal of sidewalks.
- Street asphalting.
Why
To ensure drinking water supply for the area’s residents and for the population of Montréal’s East End.
Closures and impact on daily life
Visit Entraves et travaux
Quick search
Need help?
Contact us if you have questions.
Are you sure you want to leave this page?
This page is not available in English. You will be redirected to the English home page.