Request a fire hydrant test
Do you work for an insurance company and need to perform a water pressure test, flow test or hydraulic test on a fire hydrant? Find out how to get a temporary use permit here.
My borough
No borough selected.
To have residual pressure tests conducted on a fire hydrant or to identify the source of a leak on public property, contact the borough.
Municipal employees are in charge of operating fire hydrants during tests.
Fees
Taxes included.
Temporary use permit | Amount |
---|---|
For monitoring during residual pressure tests | $397.60 |
Test to identify the source of a leak on public property | $471.20 |
Document
Communication channels
Direction du développement du territoire Division des études techniques
Suite 600
Montréal, QC H2N 2H8
Send your completed application form (in French) and your documents at least 2 business days before work is scheduled to begin.
To have residual pressure tests conducted on a fire hydrant or to identify the source of a leak on public property, contact the borough.
Municipal employees are in charge of operating fire hydrants during tests.
Communication channels
By phone
Direction des travaux publics
To have residual pressure tests conducted on a fire hydrant or to identify the source of a leak on public property, contact the borough.
There are no tests during freezing temperatures between November 15 and April 15.
Municipal employees are in charge of operating fire hydrants during tests.
Fees
Taxes included.
Temporary use permit | Amount |
---|---|
For monitoring during residual pressure tests | $397.60 |
Test to identify the source of a leak on public property | $471.20 |
Document
Communication channels
By e-mail
Send your completed application form (in French) and your documents at least five business days before work is scheduled to begin
To have residual pressure tests conducted on a fire hydrant or to identify the source of a leak on public property, contact the borough.
Municipal employees are in charge of operating fire hydrants during tests.
Fees
Taxes included.
Temporary use permit | Amount |
---|---|
For monitoring during residual pressure tests | $397.60 |
Test to identify the source of a leak on public property | $471.20 |
Submit a request
Outside of Montréal: 514-872-0311
Monday to Friday: From 8:30 a.m. to 8:30 p.m.
Saturday, Sunday and public holidays: From 9 a.m. to 5 p.m.
To have flow tests conducted on a fire hydrant, contact the borough.
Municipal employees are in charge of operating fire hydrants during tests.
Applications are accepted beginning on March 1.
Tarifs
Test de débit ou de pression de l’eau | Prix |
---|---|
Du lundi au jeudi, entre 7 h et 15 h | 150 $ |
En dehors de cet horaire | 390 $ |
Demande faite dans les 48 heures ouvrables sans prise de rendez-vous | 390 $ |
Communication channels
Montréal, QC H8R 4A8
Faites votre demande de permis par courriel et présentez-vous à nos bureaux pour effectuer le paiement selon la durée du permis.
Mode de paiement
- Chèque à l’ordre de la Ville de Montréal
- Carte Visa ou MasterCard
- Argent comptant
Veuillez faire une demande au moins 3 jours ouvrables avant la date d’utilisation prévue. Le paiement se fait au Bureau Accès Montréal – LaSalle.
To have flow tests, residual pressure tests or a hydraulic test conducted on a fire hydrant, contact the borough.
Municipal employees are in charge of operating fire hydrants during tests.
No tests are conducted between December 1 and April 30.
Fees
For monitoring during residual pressure tests: $397.60 (taxes included)
Document
Communication channels
By e-mail
Send your completed application form (in French) mention the address in the subject line of the email.
To have residual pressure tests conducted on a fire hydrant or to identify the source of a leak on public property, contact the borough.
Municipal employees are in charge of operating fire hydrants during tests.
Fees
Taxes included.
Temporary use permit | Amount |
---|---|
For monitoring during residual pressure tests | $397.60 |
Test to identify the source of a leak on public property | $471.20 |
Document
Communication channels
By e-mail
To have residual pressure tests conducted on a fire hydrant or to identify the source of a leak on public property, contact the borough.
Municipal employees are in charge of operating fire hydrants during tests.
Fees
Temporary use permit | Amount |
---|---|
For monitoring during residual pressure tests | $397.60 |
Test to identify the source of a leak on public property | $471.20 |
Submit a request
Outside of Montréal: 514-872-0311
Monday to Friday: From 8:30 a.m. to 8:30 p.m.
Saturday, Sunday and public holidays: From 9 a.m. to 5 p.m.
To have residual pressure tests conducted on a fire hydrant or to identify the source of a leak on public property, contact the borough.
Municipal employees are in charge of operating fire hydrants during tests.
Fees
Taxes included.
Temporary use permit | Amount |
---|---|
For monitoring during residual pressure tests | $397.60 |
Test to identify the source of a leak on public property | $471.20 |
Document
Communication channels
By e-mail
Send your completed application form (in French) and your documents at least 4 business days before work is scheduled to begin.
To have flow tests conducted on a fire hydrant, contact the borough.
Municipal employees are in charge of operating fire hydrants during tests.
Communication channels
By phone
Outside of Montréal: 514-872-0311
Monday to Friday: From 8:30 a.m. to 8:30 p.m.
Saturday, Sunday and public holidays: From 9 a.m. to 5 p.m.
To have residual pressure tests conducted on a fire hydrant or to identify the source of a leak on public property, please fill the form (in French) and contact the borough.
Municipal employees are in charge of operating fire hydrants during tests.
Fees
Taxes included.
Temporary use permit | Amount |
---|---|
Monitoring during residual pressure tests | $397.60 |
Test to identify the source of a leak on public property | $471.20 |
Document
Communication channels
Direction des travaux publics
Montréal, QC H2V 0A8
To have residual pressure tests conducted on a fire hydrant or to identify the source of a leak on public property, contact the borough.
Municipal employees are in charge of operating fire hydrants during tests.
How to apply
Send us this information:
- Company name, address, phone number and e-mail
- Reason for using the fire hydrant
- Location of the work, with plans if necessary
- Planned dates of use
- If a specific fire hydrant is required, please provide its number or exact location
- The contract or purchase order number, if a contract awarded by the city is involved
Fees
Taxes included.
Type of test | Amount |
---|---|
Residual pressure tests | $397.60 |
Test to identify the source of a leak on public property | $471.20 |
Document
Request a test
Direction des travaux publics
Send your form (in French) and your documents at least 10 business days before work is scheduled to begin.
To have residual pressure tests conducted on a fire hydrant or to identify the source of a leak on public property, you must first apply for a temporary use permit for a fire hydrant.
To do so, please complete the form below and pay the fee.
Municipal employees are in charge of operating fire hydrants during tests.
There are no residual pressure tests between November 15 and April 15 because when there is ice on the ground, they could compromise pedestrians’ safety.
Fees
Taxes included.
Temporary use permit | Amount |
---|---|
For monitoring during residual pressure tests | $397.60 |
Test to identify the source of a leak on public property | $471.20 |
Document
Apply
Division de l’urbanisme, des permis et de l'inspection
Montréal, QC H1B 2Z1
Payment method
Click on the place to see accepted methods of payment.
Please submit the form at least five working days before work is scheduled to begin.
Division de l’urbanisme, des permis et de l’inspection
Please submit the form at least five working days before work is scheduled to begin.
To have flow tests, residual pressure tests or a hydraulic test conducted on a fire hydrant, contact the borough.
Municipal employees are in charge of operating fire hydrants during tests.
Fees
Taxes included.
Type of test | Amount |
---|---|
For monitoring during residual pressure tests | $397.60 |
Test to identify the source of a leak on public property | $471.20 |
Document
Apply
By e-mail
To have flow tests conducted on a fire hydrant, go to the Accès Montréal Office of the borough.
Upon receipt of the form and the payment, an instruction sheet will be provided to you and you will need to contact the Section de l’aqueduc to make an appointment for the test. Municipal employees are in charge of operating fire hydrants during tests. You can find all the information on the instruction sheet.
No permits are issued between November 15 and March 31.
Fees
Taxes included.
Flow test | $397.60 |
---|
Document
Communication channels
In person
Montréal, QC H4M 2M7
Payment method
Click on the place to see accepted methods of payment.
Fill out the application form (see above) and bring it to our offices to make payment.
To have flow tests, residual pressure tests or a hydraulic test conducted on a fire hydrant, contact the borough.
Fees
Residual pressure tests | ||
---|---|---|
From Monday to Friday, between 7:00 A.M. and 4:00 P.M. | $107 | |
After working hours | $214 |
Document
Communication channels
Division des études techniques
Montréal, QC H1P 1X5
Send your completed application form (in French) and your documents before work is scheduled to begin.
Division des études techniques
To have flow test conducted (flow measurement, static and residual pressure, National Fire Protection Association test), contact the borough.
Communication channels
By e-mail
To have residual pressure tests conducted on a fire hydrant or to identify the source of a leak on public property, contact the borough.
Municipal employees are in charge of operating fire hydrants during tests.
No tests are allowed between December 1 and April 15.
Fees
Taxes included.
Temporary use permit | Amount |
---|---|
For monitoring during residual pressure tests | $397.60 |
Test to identify the source of a leak on public property | $471.20 |
Document
Communication channels
To have residual pressure tests conducted on a fire hydrant or to identify the source of a leak on public property, contact the borough.
Municipal employees are in charge of operating fire hydrants during tests.
Fees
Taxes included.
Temporary use permit | Amount |
---|---|
For monitoring during residual pressure tests | $397.60 |
Test to identify the source of a leak on public property | $471.20 |
Document
Communication channels
By e-mail
Find a borough
Boroughs
Need help?
Contact us if you have questions.
Are you sure you want to leave this page?
This page is not available in English. You will be redirected to the English home page.